150TPD 50% H₂O₂ Project


HeBang Technology has accumulated a lot of experience in executing a large number of projects, and further optimized the process package. In December 2019, together with the chief engineer of the end user, HeBang built a 120TPD Hydrogen Peroxide project for the owner.

Project Introduction

Construction scale and content 

Project construction conditions:Independently complete the EPC project general contract
Schedule time:From October 2019 to September 2021
Schedule planning:

October-February 2020: Beginning to enter the project implementation stage;

March-June 2020: Optimized process package engineering design;

July-December 2020: BOM submission completed; equipment production;

January 2021 - October 2021: Equipment guide installation, construction and commissioning

Technology: 

Process package engineering design:mading changes and optimizations: changing the structure of the fluidized bed reactor, changing the overall structure of the reaction unit, achieving energy saving and emission reduction, greatly shortening the reaction time, etc., and appling for 3 patents.